A new plant with thirteen years of PCBA behind it
Tradewind PCBA builds PCBAs in Rayong, Thailand. The plant is new; the engineers who run it have built PCBAs since 2012 and brought their process, inspection gates and sourcing network with them, so customers can add production outside China without starting over.
What stands behind a new plant
The Rayong plant opened in April 2025 on a 16,000 m² site we own, backed by an investment of RMB 200 million (about US$28 million).
It runs on the MES, inspection gates and 860+ partner sourcing network our engineers have used for more than a decade, building PCBAs for robotics, automotive, power-tool and new-energy customers. The first program transferred here reached volume production inside its six-month window.
- In production since
- April 2025
- People in Rayong
- 250+
- Owned site
- 16,000 m²
- SMT clean room, Class 100,000
- 2,500 m²
- Through-hole and assembly area
- 3,000 m²
- Investment
- US$28M

Where we are, and why it matters for your shipments
We are in Amata City Rayong Industrial Zone, inside Thailand's Eastern Economic Corridor. Automotive, electrical and new-energy manufacturers operate all around us, so molding, die-casting, CNC and logistics partners are close by.
- Laem Chabang deep-sea port: about 30 minutes, for sea freight
- Bangkok Suvarnabhumi Airport: 1.5–2 hours, for samples and urgent lots by FedEx, DHL or UPS
- Pattaya: 30 minutes, for visiting teams
Amata City Rayong Industrial Zone, Nikhom Phatthana, Rayong 21180, Thailand
The team
Process engineering
26 engineers. 60% have 8+ years in PCBA process, equipment and test; 20% come from Fortune Global 500 EMS companies.
Quality
58 people, 3 of them IPC-certified. Half have 5+ years in PCBA quality control.
Manufacturing
120 people. Core technicians have 10+ years of SMT and through-hole experience.
Supply chain
18 buyers, each with 3+ years in electronics sourcing.
Milestones
Our core engineers start building PCBAs for electronics brands.
Construction starts on the Rayong plant.
Production starts: SMT clean room, through-hole lines and test running in Rayong.
First customer transfer, a welding-machine PCBA for a US power-tool brand, reaches volume production on schedule.
Want to see the plant before you commit?
Book a visit to the lines. Send your board details first and we will show you where it would be built.