Quality you can check, not just read about
Certificates get you on a supplier list. What keeps a program running is catching problems before they ship, and showing you the records when you ask.
What you can expect on every program
No silent substitutions
We build to the manufacturer part numbers on your BOM. Any alternate is proposed in writing with its datasheet and used only after you approve it.
Changes approved first
Process, material or site changes that affect your product are notified and approved before they happen, not discovered afterwards.
Records by serial number
Incoming parts, SPI, AOI, X-ray, FCT and final inspection results are stored against each board's barcode and available to you.
A line that stops itself
When first-pass yield falls below its control limit, the MES stops the line until the cause is understood and fixed.
Defects are ours to fix
Boards we built that fail your incoming inspection are reworked or replaced at our cost.
Status you can see
Order review, purchasing, scheduling, production, inspection and shipping status are shared with you online in real time.
19 inspection gates, in the order a board meets them
Thirteen of these stations feed data straight into the MES, so a defect found at one gate can be traced back to its reel, its paste print and its oven profile.
- DFM failure analysis
- Order review
- Incoming inspection
- 3D solder paste inspection
- First-article inspection
- Smart first-article tester
- AOI
- Visual inspection
- X-ray
- QA inspection after SMT
- Through-hole line inspection 1
- Through-hole line inspection 2
- AQL sampling
- QC inspection
- Functional test (FCT)
- QA inspection after test
- Outgoing quality control (OQC)
- Conformal coating inspection
- Final QA release
Parts you can trust
- Suppliers qualified to ISO 9001; distributors hold manufacturer authorization letters
- Every reel registered by barcode at receiving and checked against the BOM before it is loaded
- RoHS and REACH compliant components
- High-value ICs can go to a third-party lab for decap, X-ray and functional testing
- Multi-source purchasing, stock management and regular supply-risk reviews
Supplier on-time delivery 98%. Inventory turns in under 7 working days.
Methods our engineers use
- APQP and PPAP for automotive programs
- Design FMEA, process FMEA and control plans
- SPC, MSA and DOE
- Six Sigma problem solving
Certifications, with their real status
Ask for copies and we send them, including issuing body and validity dates.
- ISO 9001:2015Quality management. Rayong plant, certified by SGS.
- ISO 14001:2015Environmental management. Rayong plant, certified by SGS.
- IATF 16949:2016Automotive quality management. Rayong plant.
- ISO 13485:2016Medical device quality management. Rayong plant.
- IPCIPC-certified staff on the Rayong quality team.
- RoHS and REACHCompliant components and processes.
The people behind the numbers
Quality depends on people who stay. Key positions are identified from our FMEAs and control plans, every operator in them is certified for the job, and their work is checked daily. All figures are for the Rayong plant.
- Quality team, 3 IPC-certified
- 58
- Process engineers, 60% with 8+ years
- 26
- Manufacturing team
- 120
- SMT first-pass yield
- 99.9%
- Lot acceptance rate
- 99%
- Turnover in key positions
- ≤5%
Qualifying a new supplier?
Tell us what your supplier audit needs. We will send certificates and a sample first-article report.